Our projects
Project |
---|
Ericsson Consolidation technical coordination & supervision |
Ericsson U900 Upgrade technical coordination & supervision |
Ericsson LTE Upgrade technical coordination & supervision |
Project |
---|
Ericsson Consolidation technical coordination & supervision |
Ericsson U900 Upgrade technical coordination & supervision |
Ericsson LTE Upgrade technical coordination & supervision |
Project |
---|
NSN 3G Upgrade technical coordination & supervision |
NSN 3G Upgrade technical coordination & supervision |
Project |
---|
Lucent BTS SWAP to Siemens BS240 |
NSN BSC Installation |
SWAP of 2G Siemens BTSs with NSN Flexi EDGE BTS |
Siemens BTSs Migration from Siemens BSC to NSN BSC |
NSN RNC Installation |
SWAP of 2G Siemens BS60 with Siemens BS 240 |
2G/3G SWAP of Siemens BTS/NodeB with NSN Flexi BTS/NodeB |
Project |
---|
Installation of Huawei BSC & RNC and extensions |
Rollout Huawei LTE eNodeBs throught Croatia |
SWAP of Ericsson NodeBs with Huawei NodeBs throught Croatia |
Drive testing and network optimization |
SWAP of Ericsson BTSs with Huawei BTSs throught Croatia |
Project |
---|
SLA for power supply |
Installation of Microvawe solution for the trial |
Installation of SiteStar cabinets |
SUN racks installation |
Battery and Ericsson modules replacement |
Project |
---|
Installation of EWSD MSC extensions |
Installation of NSN R4 core |
Installation of NSN RNCs and extensions |
SWAP of Siemens 3G NodeBs with NSN Flexi WCMA NodeBs throught Croatia |
Installation of Huawei Packet core (SGSN, GGSN) |
NSN Flexi WCDMA Node B Rollout |
SLA for power supply |
Core network optimization service (GOS) |
Technical support of Huawei DWDM (SLA) |
NSN UMTS 900 BTS pilot installation |
Installation of Huawei LTE trial |
NSN LTE BTS instalation |
Migration of Siemens BS240 BTS from Siemens BSC to NSN BSC |
SLA for MasterGuard |
TMSS installation |
NSN BSC/RNC installation |
Installation of Huawei DWDM |
LIMS installation |
TMA swap |
SWAP of Siemens 2G BTSs with NSN Flexi 2G BTSs throught Croatia |
Instalation of Huawei FTTB trial |
Installation of Huawei BSC & RNC and extensions |
Installation of Huawei SBC |
Installation of Huawei IP Core |
Expansion of LGC InDoor system with NSN base station solution for West Gate shopping center |
Rollout of NSN LTE on Spectrum project |
SWAP of NSN 2G&3G and rollout of LTE on Lot2 project |